Property Details
- Property: Apartment (New Build)
- Bedrooms: 2
- Bathrooms: 1
- Receptions: N/A
Casa Boteto
Superbly priced small block of studios, 1 and 2 bed apartments only a 2 minutes walk to Estoril Beach, Sal Rei. Studios at €43400, 1 beds at €67500, 2 beds from €82500
Features
Casa Boteto, just 300 m south of Sal Rei on the beach of Estoril, has all facilities within short walking reach. Praia das Chaves, the more than 8 km long white sand beach stretches down south just right from the development. The apartment construction will begin in September 2007 with studios, 1 and 2 bed apartments and is due for completion in summer 2009. Only the best building materials will be used and we guarantee the operational functionality of the building as a whole. The apartments come with kitchen and bathroom, usually shower, but furniture can be made or imported at buyers expense. We also offer to furnish apartments if it will be rented through us and the price for the furniture deducted from the rentals. Further all apartments are equiped with satellite TV cabelling and power supply and water drainage to receive airconditioning.
Boteto Lda. as a local company will stay in charge of all future maintenance, as well as advertising and renting the propeties to long or short term occupants. We don`t give any false return guarantee, but as we intend to keep about half the property in our own posession we will work in our own best interest to efficiently rent the property.
Prices
Casaboteto Ground Floor
Two bedroom Apartment, 61,56 sqm + balcony 82500 euros
Casaboteto 1st and 2nd Floor
Studio, 30,93 sqm + balcony 43400 euros ALL SOLD
One bedroom Apartment, 48,24 sqm + balcony 67500 euros
Two bedroom Apartment, 84,05 sqm + balcony 102.800 euros
CONSTRUCTION AND PAYMENT SCHEDULE
CASA BOTETO
The construction schedule will be as follows:
1. Construction starts in September with foundations being finished by end November, last concrete for the roof beginning till mid March.
The payment of the first 30% should be made at the beginning of this phase, the other 30% at the end.
2. The second phase includes water and electricity till beginning of May, simultaniously starts the finishing of outside and inside walls, ceilings and floors which will take till September 2008.
At the end of this phase the third 30% should be paId.
3. The final phase which is painting, ceramics, windows and woodwork should be finished by March 2009, allowing another three to four month for details.
Then, when the building is officially registered as a habitational building final payment is made
and the contract at the notary signed.